ATY steel  building
Call ATY Steel Buildings 1800-487-8171
for all your steel building needs.

METAL BUILDING FRAMING (Con't.)

STEP 8

Add all field cut openings --walk door openings, window openings, and base angle.

Steel Buildings Framed Openings

Base Angle For Metal Building

Use power driven fasteners such as "Ramset" (or equal) .140 dia. Straight shank with 1 %" penetration and min. allowable shear of 22-#, spaced on 2'-0" centers.


<-- previous page                                     next page -->

Steel Buildings Erection Manual Page1
Steel Buildings Erection Manual Page2
Steel Buildings Erection Manual Page3
Erection Manual Page4
Erection Manual Page5
Erection Manual Page6
Steel Building Erection Manual Page7
Steel Building Erection Manual Page8
Steel Building Erection Manual Page9
Steel Building Erection Manual Page10
Steel Building Erection Manual Page11
Metal Building Erection Manual Page12
Metal Building Erection Manual Page13
Metal Building Erection Manual Page14
Metal Building Erection Manual Page15
Metal Building Erection Manual Page16
Metal Building Erection Manual Page17
Metal Buildings Erection Manual Page18
Metal Buildings Erection Manual Page19
Metal Buildings Erection Manual Page20
Metal Buildings Erection Manual Page21
Metal Buildings Erection Manual Page22
Erection Manual Page23
Buildings Erection Manual Page24
Buildings Erection Manual Page25
Buildings Erection Manual Page26
Buildings Erection Manual Page27
Buildings Erection Manual Page28
Erection Manual Page29
Erection Manual Page30
Steel Building Erection Manual Page31
Erection Manual Page32

 

ŠATY Steel Buildings