SQUARING THE FORM WITH STRING LINES (for Metal Building)
Steel Buildings Foundation Layout
Regardless of the type of steel buildings foundation that is used
and its specific configuration, the metal building foundation
outline should be carefully and accurately laid out before any
excavation is made. Whenever possible, a transit or similar means
should be used to layout the steel building foundation perimeter;
this will insure accurate placement of corner measurements and, in
turn, insure a square buildings foundation.
Your building is manufactured to close tolerances and therefore
requires a square and level foundation. The following method may be
used to achieve the proper steel building foundation:
NOTE: Wind can blow the strings sideways, or the strings might
sag while putting up forms. Support the string lines to prevent this
if necessary.
For the greatest accuracy, measure the diagonal and adjust the
string lines until the two diagonal dimensions are equal. If length
A8 = CD, the steel building foundation will be square. (In addition,
AD = C8 and AC = 80)
<--
previous page Steel Building
Erection
next page Steel Building
Erection -->
|